New Forest LIFE III Wetlands Project

Introduction

The objectives of the New Forest LIFE III Wetland Restoration project was to:

  • Restore the priority interest features of the New Forest SAC and their supporting adjacent habitats in accordance with the SAC Management Plan
  • Establish their long term sustainability through the development of a mechanism that ensures the integrated management of the main water basins
  • Creation of suitable conditions for the regeneration of a significant further area of priority habitat.

Description

The New Forest is the largest site (14,800 ha) in western Europe where heathland, grassland, mire and pasture woodland habitats survive together in what is a functioning ecosystem based on a continuing practice of pastoralism.

They occur as part of a network of wetland habitats that are totally dependent on their local hydrological systems. This complex mosaic of wildlife habitats was formerly common in lowland Western Europe, but is now rare and fragmented.

The unusual combination is maintained largely by the presence of commoners' grazing ponies and cattle. European dry heat gives way to Northern Atlantic wet heath on the poorly drained soil, which often fringe the valley mrires and include a range of different plant communities such as depressions on peat substrates of the Rhyncosporion, alkaline fens and transition mires.

Restoration Delivered

The project restored a total of:

  • 261 ha of riverine woodland
  • 18 ha of bog woodland
  • 141 ha of wet grassland
  • 184 ha of valley mire
  • 10 km of river

Peatland restoration techniques included stabilisation, grip blocking, vegetation removal and rewetting.

Site Activity

The practical works of the LIFE3 project targeted three of the six main water basins of the New Forest cSAC: Lymington River; Avon Water and Hampshire Avon.

These three water basins contain the greatest proportions of riverine woodland and bog woodland within the cSAC. They each highlight different restoration issues because they overlay different geomorphologies and bring different sets of partners to the table to discuss mechanisms for delivery.

The actions restored the hydrology of the priority habitats and adjacent wetland habitats to re-establish the links between habitats currently restricted by fragmented land use patterns.

Actions to prepare for this work included geomorphological, topographical and hydrological surveys.

Water Basin Management Forum developes the detail of the work completed by the LIFE3 project team by proposing consultations with a wide range of partners whilst acting as a mechanism to deliver an integrated holistic and strategic approach to the management of the cSAC’s water basins at every level.

Practical actions include the use of the innovative technique developed as part of the LIFE 2 project for mire restoration and a technique that reinstates debris dams to restore natural river channel features.

Other actions ncluded the removal of invasive species, the establishment of a coppicing regime and installing protective fencing from deer to aid the establishment of new colonies.

Public awareness was targeted to support the project, and progress and performance monitoring
of the project was completed. 

Partners

Six partner organisations were organised in delivering the project:

  1. English Nature (now Natural England)
  2. Environment Agency
  3. Forestry Commission
  4. Hampshire County Council
  5. National Trust
  6. RSPB
{"zoom":12,"lat":50.8765244,"lon":-1.6314631,"markers":{"0":{"lat":50.8765244,"lon":-1.6314631}}}

Project Name: New Forest LIFE III Wetlands Project

Organisation / Lead partner: Natural England

Location: New Forest, Hampshire

Approximate area covered: 184 ha

Conservation Status: Site of Special Scientific Interest (SSSI), Special Area of Conservation (SAC), Special Protection Area (SPA), National Park (NP)

Predominately: Lowland

Peat Habitats: Lowland raised bog, Lowland heath

Project Type: Management, Research

Year Project Began: 2002

Project End Date: 2006

Useful Downloads:

    South West Peatland Partnership vacancies
    South West Peatland Partnership job vacanciesThe South West Peatland Partnership (Exeter, Devon) have 8 job vacancies available to support their…
    UNFCCC COP26
    Reflections from the UNFCCC COP26 Peatland PavilionThe first COP26 Peatland Pavilion stood out as one of only a handful of thematic pavilions and one…
    The Peatlands of Britain and Ireland cover
    'The Peatlands of Britain and Ireland' by Clifton BainThe IUCN UK Peatland Programme's Clifton Bain completes his trilogy with this look at the Peatlands…
    PeatLIFE People
    Pennine PeatLIFE film by Land & Sky MediaAt the September IUCN UK Peatland Programme/LIFE conference film night, the North Pennines AONB…
    Renée Kerkvliet-Hermans, Peatland Code Co-ordinator at the 'Finance for Nature - Positive Future for People and the Planet'
    Peatland Code updateThe Peatland Code now has 48 Projects registered with a total of almost 8000 ha of peatland…
    NatureScot Peatland ACTION we're hiring flyer
    NatureScot Peatland ACTION expansion and opportunitiesThe NatureScot Peatland ACTION team is expanding to meet demand and provide more green jobs to…
    Curlew by Damian Waters
    Climate change and UK birds – a focus on peatlandsIn early November, the British Trust for Ornithology (BTO) launched a new report on the impacts of…
    Digger reprofiling
    Pennine PeatLIFE finishes restoration works in the Forest of BowlandThe Forest of Bowland AONB is the westernmost extent of the Pennine chain.
    Wave dams Cairngorms National Park
    Drain (grip) blocking in the Cairngorms National Park Peatland ACTION Project Officer Matt Watson (Cairngorms National Park) provides an insight into…
    MFFP image
    The importance of peatlands in protecting urban areas in a warming worldGreater Manchester was chosen by the Making Cities Resilient 2030 initiative to serve a three-year…
    Dawn at Marches Mosses by Stephen Barlow
    Marches Mosses marks 30-year milestone in fight against climate change An internationally important lowland raised peat bog between England and Wales celebrates its 30th…
    Virtual Peatland Pavilion
    Virtual Peatland Pavilion for COP26 UNFCCCWe are delighted to launch a new dome in the Virtual Peatland Pavilion for COP26 UNFCCC.