Peatland Code Projects

The UK Land Carbon Registry and Registry Guidance

Image: Sphagnum pulchrum © Norrie Russell

Peatland Code Projects

 

Peatland Code projects are hosted on the UK Land Carbon Registry alongside Woodland Carbon Code projects.  

The UK Peatland Code Registry is the Peatland Code’s electronic database that stores and publicly displays data about the status of Projects and ownership and use of Carbon Units. Managed by IHS Markit, it records transactions and provides a public and transparent picture of UK-based Carbon Units.  All Peatland Code Projects and Carbon Units must be recorded on the Peatland Code Registry.

 

Peatland Code projects on the UK Land Carbon Registry- correct as of 10th May 2021:

 

Total number of Peatland Code projects  30
Total Area of Peatland  4992 ha
Average project duration (for validated projects)  62 years
Average project size (for validated projects)  615 hectares

 

Project status breakdown:

Registered projects
Number of projects registered and ‘under development’                     24

 

Validated projects
Number of validated projects                              6           
Projected emissions reduction as total number of validated, claimable Pending Issuance Units* (PIUs)                         126,313

 

Verified projects
Number of verified projects                               0
Projected emissions reduction as total number of verified, claimable Peatland Carbon Units* (PCUs)                               0
* 1 Carbon Unit = 1 tonne of Carbon Dioxide equivalents

 

IUCN UK PP Conference 2021
IUCN UK PP Conference 2021 - Save the dateSave the Dates: 13th - 16th September 2021
Minister Poots pictured with Jennifer Fulton, CEO of Ulster Wildlife
Northern Ireland Peatland Strategy ConsultationEnvironment Minister, Edwin Poots has launched a public consultation on the draft Northern Ireland…
Virtual Peatland Pavilion
Peatland Pavilion proposal for COP26 programmeOpportunity to contribute to and participate in proposing and shaping the first ever dedicated…
Diggers on Bwlch y Groes
Wales’ first carbon-funded peatland restoration project is complete!A peatland restoration project at Bwlch y Groes on the edge of the Snowdonia National Park is the…
England launches Peat Action Plan
England launches Peat Action PlanThe IUCN UK Peatland Programme welcomes the long-awaited publication of the England Peat Action…
Screenshot of PeatDatHub database
Launch of the PeatDataHub PeatDataHub is a research hub for communicating peatland science and managing peatland monitoring…
Eyes on the Bog equipment displayed on Water Works site
Eyes on the Bog monitoring at the Water Works projectJack Clough (University of East London’s) takes us through the process of installing an Eyes on the…
Helicopter flying over Moors for the Future site with restoration materials
Moors for the Future deliver biggest conservation season yet in a challenging yearAgainst a backdrop of ever-changing circumstances and a challenging year for nature, Moors for the…
Musician Sarah Smout on Fleet Moss with her cello
Yorkshire Peat Partnership: A music video on Fleet MossWith the help of Yorkshire Peat Parnership, musician Sarah Smout filmed a music video on Fleet Moss…
Cottongrass on peatland © Marches Mosses BogLIFE Project
Marches Mosses BogLIFE Project and Australian Wetlands Collaboration puts Arts Council England Funding to WorkThe ‘Mosses and Marshes’ project has newly been awarded a grant from Arts Council England.
Sphagnum moss © Moors for the Future Partnership
Study monitors single-species sphagnum plug growth on blanket bogThe study by Moors for the Future Partnership was carried out to discover the most effective…
British Ecological Society nature-based solutions graphic (city and train)
British Ecological Society: Nature-based Solutions for Climate Change in the UK ReportThe British Ecological Society have today published their landmark report offering the first…