Question: What suggestions are there to enhance access to Historic features?

Answer: As a minimum current access should be maintained, and historic features and sites should not be fenced unless absolutely necessary. If a site is fenced a pedestrian gate should be provided to facilitate access.
For access enhancement to notable historic features and sites, boardwalks or viewing platforms could be constructed (with relevant permissions attained), scrub vegetation could be cleared around or on approach to a historic site or feature, existing tracks upgraded to provide bicycle or wheelchair access, and information boards or digital interpretation via apps added to enhance visitor experience and accessibility. Critically, any enhancement of access should consider all potential users, including users with visual or movement impairments, to ensure that the heritage assets is, as far as possible, enjoyed and experienced by all.

 

Question: The emission factors have now changed in Version 2 what happens if the validation was carried out to V.1.2?   

Answer: Verification will always happen to the latest emission factors so in this case projects will be verified to V.2. This is to keep to Peatland Code robust and not oversell carbon savings, some of our projects run for 100 years and we should not be using 100-year-old emission factors.

 

Question: If a pre-restoration survey was conducted in May 2023, will it still be possible for registration on a 100m grid until May 2025.

Answer: Yes this would be acceptable as this falls withing the given three-month transition period any later than the 1st of June 2023 and the project would have to use V2 Field Protocol.


Field Protocol Fens
 


Question: What is the number of required dipwells and rust rods per ha of restored ground? 

Answer: Currently this is per assessment unit

 

Question: Is 5 piezometers always needed if the land is all the same level? 

Answer: Yes initially this is always needed, but if all the reading are the same we can look at reducing them after 1 year for more information see Field Protocol section Fens.

 

Field Protocol Bogs

Question: Can pre-restoration drone surveys replace baseline fixed point photos from each peat depth recording point?

Answer: Yes and you are no longer required to have photographs at every survey point, please see the Field Protocol for more detail.

 

Question: Modified bog and drained bog both transition to rewetted modified. What must be evidenced to demonstrate condition category change between them?

Answer
: To evidence this you will need to show digger footprint using GPS or drone imagery.

Question: Can previous surveys be assessed against the definition of ‘modified bog’ in V2.0, and if so, what is required to demonstrate compliance to the new standard? For instance, if you have a report less than a1 year old that has not yet been submitted for validation but has areas of modified, assessed against V1.2 criteria and surveyed in 50m x 50m intervals?

Answer: Yes previous surveys can be used to assess modified, but you have to keep in mind that only the modified areas on which you are doing active work (e.g. plug planting or bunding) are eligible.


Question: When you are mapping a gully – would you map just one linear feature i.e., one side of the gully or map both haggs within the gully system.

Answer: If all bare, including the base, otherwise just map one feature.


Validation and verification

Question: When a project is already in progress and validated to version 1.2 when it comes to the restoration validation will that have to be to version 2?

Answer: If you have validated a project against version 1.2 you also carry out the restoration validation to version 1.2. However, when it comes to the emission factors that will need to be to the lates version of the code.

 

Question: Will we have to re-do the emissions calculations for projects that have already been validated? Would we do this at restoration validation/verification?

Answer: Yes, you will need to do this at verification, this might change your PIUs which could have a small fee to amend on Markit. If you have not yet set up PIUS you should do this when these get set up, in this instance please send the Peatland Code team an amended emission calculator.

Question: How old can a baseline field survey be to be eligible for the Peatland Code?

Answer: Baseline field surveys can be up to 3 years old when submitting all documentation to the validation body for Project Plan Validation.

 

 

Additionality

Question: Does money invested in a project by a landholder or another party (be it in restoration, monitoring or maintenance), where no carbon sale has taken place, count as carbon finance? 

Answer: Yes, the landowners own money with a view to sell carbon later counts as carbon finance. In the Non-carbon income, we mean other external private sources directly linked to the project costs.


Question: Could an applicant take 100% grant funding providing there are 15% of other costs throughout the project duration that the landowner pays for?

Answer: Only a maximum 85% of the total project costs can be covered by grant funding and non-carbon income. This means that in some cases 100% of the initial restoration works can be covered by a grant, since the total project costs is the initial restoration work and ongoing monitoring and maintenance of the site. If the ongoing monitoring and maintenance is 15% or more of the total project costs, 100% of the initial restoration work could indeed be funded by a grant. The costings are checked at the project plan validation by an independent validation/verification body.

 

Question: Is foregone income now included within the main additionality Test 2 cost calculation?

Answer: No, after feedback during the Technical Advisory Board income foregone is not included under Test 2.

Peatland Code and Peatland ACTION

Please follow the link below to view some of the most frequently asked questions about the funding/ finance available, what the two processes currently involve and where they align. 

Peatland ACTION and Peatland Code - Frequently Asked Questions (FAQs) | NatureScot

 

If your query was not answered in the above sections or you require further information please email peatlandcode@iucn.org.uk

Salmon leaping out of the water. Image credit Stephen Barlow
New species showcase - Atlantic salmonThe latest in our series of species showcases celebrates the Atlantic salmon and the role that…
Exterior view of Virtual Peatland Pavilion showing four large domes in an urban landscape
New Virtual Peatland Pavilion launched for COP29To raise awareness of the global importance of peatlands during COP29, the latest pavilion has been…
Cover image for 'The most important plant in the world' showing the film's title in yellow text over a background of Sphagnum moss
Specially commissioned film celebrates 'The most important plant in the world'The IUCN UK Peatland Programme has commissioned the first in a series of short films, celebrating…
Cumbrian tarn - large body of water with emergent vegetation and hills in the distance. Image credit Steve Hewert.
Launch of the Peatland Code Version 2.1The IUCN UK Peatland Programme has launched a new update to the Peatland Code, which helps to boost…
Flat peatland landscape on fire with large plumes of smoke. Image credit Paul Turner
New brief highlights the importance of peatland rewetting for wildfire resilienceThe IUCN UK Peatland Programme's latest publication explores recent evidence from the UK and North…
Painting of a river in spate: Peter Graham 1866, 'A spate in the highlands'
Call for proposals for Water Research Seminar SeriesThe IUCN UK Peatland Programme and the Environment Agency are delighted to announce a series of…
'Work in progress' sign with a digger on it next to two photographs of children drawing on large sheets of paper
The Power of the Peat Bogs! How pupils turned their environmental education into a song Primary school pupils who have engaged with a project to restore ancient peatland and traditional…
SWPP award
South West Peatland Partnership awarded gold by Global Good AwardsThe South West Peatland Partnership won a Gold award at the Global Good Awards for their work…
Exterior view of Virtual Peatland Pavilion showing four large domes in a desert landscape
Seeking content for the COP29 Virtual Peatland PavilionThe IUCN UK Peatland Programme and Global Peatlands Initiative are seeking new content for an…
UK Peatland Strategy
New report celebrates UK peatland restoration – but climate and nature targets still at riskAnalysis reveals 250,000 hectares of peatland restoration activity over 30 years – way short of the…
Peatland at Inshriach, Allt a’ Mharcaidh
Largest ever gathering of UK peatland experts to celebrate ‘Peatlands, People and Nature’ in the Cairngorms National ParkAviemore in the Cairngorms National Park is to play host to the UK’s largest gathering of peatland…
Landscape of mountains and forest
View the full programme for #PeatConf24 and book your tickets now!The full programme for the IUCN UK Peatland Programme 2024 conference ‘Peatlands, People and Nature…