New Forest LIFE III Wetlands Project

Introduction

The objectives of the New Forest LIFE III Wetland Restoration project was to:

  • Restore the priority interest features of the New Forest SAC and their supporting adjacent habitats in accordance with the SAC Management Plan
  • Establish their long term sustainability through the development of a mechanism that ensures the integrated management of the main water basins
  • Creation of suitable conditions for the regeneration of a significant further area of priority habitat.

Description

The New Forest is the largest site (14,800 ha) in western Europe where heathland, grassland, mire and pasture woodland habitats survive together in what is a functioning ecosystem based on a continuing practice of pastoralism.

They occur as part of a network of wetland habitats that are totally dependent on their local hydrological systems. This complex mosaic of wildlife habitats was formerly common in lowland Western Europe, but is now rare and fragmented.

The unusual combination is maintained largely by the presence of commoners' grazing ponies and cattle. European dry heat gives way to Northern Atlantic wet heath on the poorly drained soil, which often fringe the valley mrires and include a range of different plant communities such as depressions on peat substrates of the Rhyncosporion, alkaline fens and transition mires.

Restoration Delivered

The project restored a total of:

  • 261 ha of riverine woodland
  • 18 ha of bog woodland
  • 141 ha of wet grassland
  • 184 ha of valley mire
  • 10 km of river

Peatland restoration techniques included stabilisation, grip blocking, vegetation removal and rewetting.

Site Activity

The practical works of the LIFE3 project targeted three of the six main water basins of the New Forest cSAC: Lymington River; Avon Water and Hampshire Avon.

These three water basins contain the greatest proportions of riverine woodland and bog woodland within the cSAC. They each highlight different restoration issues because they overlay different geomorphologies and bring different sets of partners to the table to discuss mechanisms for delivery.

The actions restored the hydrology of the priority habitats and adjacent wetland habitats to re-establish the links between habitats currently restricted by fragmented land use patterns.

Actions to prepare for this work included geomorphological, topographical and hydrological surveys.

Water Basin Management Forum developes the detail of the work completed by the LIFE3 project team by proposing consultations with a wide range of partners whilst acting as a mechanism to deliver an integrated holistic and strategic approach to the management of the cSAC’s water basins at every level.

Practical actions include the use of the innovative technique developed as part of the LIFE 2 project for mire restoration and a technique that reinstates debris dams to restore natural river channel features.

Other actions ncluded the removal of invasive species, the establishment of a coppicing regime and installing protective fencing from deer to aid the establishment of new colonies.

Public awareness was targeted to support the project, and progress and performance monitoring
of the project was completed. 

Partners

Six partner organisations were organised in delivering the project:

  1. English Nature (now Natural England)
  2. Environment Agency
  3. Forestry Commission
  4. Hampshire County Council
  5. National Trust
  6. RSPB
{"zoom":12,"lat":50.8765244,"lon":-1.6314631,"markers":{"0":{"lat":50.8765244,"lon":-1.6314631}}}

Project Name: New Forest LIFE III Wetlands Project

Organisation / Lead partner: Natural England

Location: New Forest, Hampshire

Approximate area covered: 184 ha

Conservation Status: Site of Special Scientific Interest (SSSI), Special Area of Conservation (SAC), Special Protection Area (SPA), National Park (NP)

Predominately: Lowland

Peat Habitats: Lowland raised bog, Lowland heath

Project Type: Management, Research

Year Project Began: 2002

Project End Date: 2006

Useful Downloads:

Green Recovery Challenge Fund
Applications open for second round of Green Recovery Challenge FundThis £40million fund will once again support projects across England to restore nature, tackle…
Peatland Code logo
IHS Markit to Launch Global Carbon Credit Meta-RegistryThe first global meta-registry aims to provide transparency and efficient tracking, accounting and…
Nature Recovery Plan
Nature’s recovery can create 7,000 new jobs in ScotlandNew research from leading Scottish environment charities shows that backing their plan for nature’s…
The Extraordinary Story of Peat and Carbon
New short animation explores the extraordinary story of peat and carbonExploring the extraordinary quantities of carbon locked up on millennial timescales within peatland…
February newsletter: winter edition
IUCN UK Peatland Programme Newsletter: Winter Edition 2021Read the latest IUCN UK Peatland Programme newsletter.
The West Cavan Bog Association Site
Eyes on the Bog: The West Cavan Bog Association SitesTwo new Eyes on the Bog sites have been established by the West Cavan Bog Association, in Fartrin…
IUCN UK PP Conference
Reflections from the 10th IUCN UK Peatland Programme ConferenceThe 10th annual IUCN UK Peatland Programme conference was delivered online for the first time, with…
UK GHG inventory
Peatland addition to the UK GHG inventory adds 3.5% to national emissionsThe end of January saw the long awaited, formal inclusion of peatlands in the UK GHG emissions…
Peatland Code update
Peatland Code updateInterest in the Peatland Code continues to grow and the team are experiencing increased demand for…
Shetland Peatland Restoration
Getting out to the bog in ShetlandAn innovative solution to accessing a Peatland Restoration site in Shetland.
Heather burn (C) North Peninnes AONB
Defra announce plans to prevent burning of vegetation on protected blanket bog habitats.Today’s announcement from Defra that the government plans to bring forward legislation to prevent…
Deforested bog 2 years post treatment
ScottishPower Renewables winter 2021 peatland restoration activityScottishPower Renewables (SPR) have completed 1267ha of deforested bog restoration using their “…