Peatland Restoration Sweden (LIFE to Ad(d)mire: Mire and Wetland Restoration)

Introduction

The Life to ad(d)mire project will restore 35 Natura 2000 sites in Sweden between 2010-2015. In total, 3000 ha of rich fens and large peatlands will be restored.

Project Aims

Funded by EU LIFE, this project aims to stop the decrease of Natura 2000 habitats and species through hydrological restoration and vegetation measures. It aims to restore 3852 ha in 11 Natura 2000 habitats, targeting six species in the Species and Habitat Directive and 14 species in the Birds Directive. The Life to ad(d) mire project is focusing on two key issues:

  1. The loss of mires and wetland due to disturbed hydrology To restore the hydrological functioning of these sites, excavators are used to fill ditches with material from the site. This is carried out during the summer months. If there is a lot of vegetation alongside the ditches then this is either removed in advance of the restoration process (i.e. the winter before) or removed during the restoration work.
  2. The loss of mires and wetlands due to loss of historical agricultural management. At the sites where only vegetation measures are planned, the work is often carried out over several years. The actions taken include haymaking, mowing and removal of common reed.

Restoration Delivered

Since the project is taking part in so many regions is Sweden, from the agricultural south to the boreal north, the problems and measures differ in each and every one of the sites. In the south there are many stakeholders to consider and involve. In the middle part of Sweden there are restorations going on at old peat mining mires, where the historical values have to be taken into consideration. Finally, in the north the greatest challenge is the large distances between roads and sites. This has provided the project team with important experience with several varying factors, which is a great strength for land management in Sweden, and wider Europe. The work of this project hopes to lead to a reduction of CO2 emissions and cleaner ground water due to the reduction of nutrients and substrate transported to the surrounding rivers, creeks and lakes. The restoration will also decrease the level of landscape fragmentation, benefitting birds and other terrestrial species.

Site Activity

The most important indicators of success are measured throughout the process, including birds, vegetation, ground water levels and water chemistry. In most of the 35 mires and wetlands, groundwater pipes have been installed inside and outside the Natura 2000 site to monitor the groundwater levels before, during and after the restorations. Water samples are taken several times each year to monitor the water chemistry before, during and after the restorations, and aerial photos were taken before restorations started and will be taken again at the end of the project. The bird monitoring is carried out during the spring with each site being visited two or three times during that season.

{"zoom":8,"lat":64.4683473,"lon":14.8861768,"markers":{"0":{"lat":64.002752891,"lon":15.061958031}}}

Project Name: Peatland Restoration Sweden (LIFE to Ad(d)mire: Mire and Wetland Restoration)

Organisation / Lead partner: LIFE to Ad(d)mire Sweden

Predominately: Upland

Project Type: Restoration

Year Project Began: 2010

Project End Date: 2015

    Buchan Bog Buddies
    Buchan Bog Buddies The RSPB and Aberdeenshire Rangers have been working with P6/P7 classes at New Pitsligo and…
    Global Peatlands Initiative
    Global Peatlands Initiative project: State of the Worlds Peatlands On the 17th of November 2022, at the UNFCCC COP27 in Sharm El-Sheik, Egypt, the Global Peatlands…
    Area of Dartmoor undergoing restoration methods, January 2023
    South West Peatland Partnership: Counting sheep to help restore peat across the UK's South WestPeatland restoration isn’t a one-size-fits-all approach. It takes a range of innovative techniques…
    Birchinlee (c) Moors for the Future Partnership
    Moors for the Future Partnership releases series of scientific and monitoring reports from MoorLIFE 2020 projectIn September 2022, MoorLIFE 2020, the landmark project which had been the focus of much of the work…
    Sphagnum moss regrowth rewards the peatland restoration action undertaken by NPAP at Tywi Forest
    Wales Peatland Action By mid-2022 National Peatland Action Programme (NPAP) could reflect on a successful initial two…
    Cuilcagh Mountain after restoration work
    Ulster Wildlife webinar: Lessons learned: 20+ years on from blanket bog restoration at Cuilcagh MountainJoin Ulster Wildlife, RPS Ireland and the Cuilcagh Lakelands UNESCO Global Geopark to discuss what…
    Peatland code version 2.0
    Launch of the Peatland Code Version 2.0The IUCN UK Peatland Programme has today launched a new and highly anticipated update to the…
    Molinia, Peatlands and Climate Transition Workshop
    Save the Date: Molinia, Peatlands and Climate Transition Workshop’Hosted by National Trust Marsden Moor, the ‘Molinia, Peatlands and Climate Transition Workshop’…
    Demonstrating Success cover art
    Peat-free Horticulture Addendum: Further case studies released This addendum to the IUCN UK Peatland Programme's 'Demonstrating Success - Peat-free Horticulture'…
    England Peat Map team at Winmarleigh Moss
    Working Towards a Peat Data StandardThe England Peat Map project is mapping the extent, depth and condition of England’s peat. Find out…
    Cors Caron Copywrite Drew Buckley Photography
    Conference 2022 - Registration closedRegistration for this year's IUCN UK Peatland Programme conference taking place live in Aberystwyth…
    Mar Estate © Mark Nicolson
    100 Project Milestone for the Peatland CodeThe Peatland Code now has 100 projects registered under the UK La