Restoring the mires of the Australian Alps following the 2003 wildfires

Introduction

The number and area of mires (fens and bog) of the Australian Alps has declined dramatically over the past 150 years due to grazing by domestic stock, recreation activities, infrastructure development, increasing feral animal damage, and exotic weed invasion. In addition to this degradation, the 2003 wildfires burnt over almost all the alpine, subalpine and montane fens and bog, with a further loss of about 15% of the functional mires existing at the time.

Description

Following the 2003 wildfires approximately 70 large peat bog areas required restoration works to ensure that they recovered to a fully functional condition. The impacts of the fires varied and damage ranged from minor burning of some Sphagnum (moss) hummocks (mainly Sphagnum cristatum), to complete destruction of the bog and fen vegetative cover and partial burning of the underlying peatbeds. The latter resulted in the loss of the functional hydrological role of the peats and as a consequence, the loss of the ecosystem services the bogs and fens provide to catchment water storage, flow regulation and runoff filtering.

Project Aims

A program of restoration and revegetation of the mires was started in March 2003 and continues to be implemented by field staff of the individual national parks within the Alps National Parks Co-operative Management Agreement. The aim is restore and enhance the capacity of the damaged areas to recover their functional hydrological role, and regenerate a stable natural mire vegetation complex. Several mire recovery monitoring and research programs were also initiated immediately post-fire to both guide the restoration work and to quantify the benefits of the various restoration techniques and programs (Hope, et al. 2006). Photo monitoring points were established at all bog and fen restoration sites and several demonstration sites were also established to visually monitor the benefits of mire restoration and to act as ecological restoration education and interpretation sites.

Restoration Delivered

Restoration works were applied to approximately 130 individual bog and fen sites burnt by the fires – about one tenth of the total number of bogs and fens burnt over by the fires. Approximately 300 ha of bog and fen ecosystem has been restored to functional and stable mires, with large areas of adjacent organic soils and associated shrub and grassland ecosystems benefiting from the improved soil moisture regime accruing from the mire restoration works. All bogs and fens, to which restoration works have been applied have recovered from a desiccated state to a saturated state, although the full recovery of this condition has taken between 15 months and six years. Based on past experience, full recovery of the functional role of the ecosystem and a complete bog and fen vegetation complex will still take many years to achieve.

Site Activity

There are two main tenets for this ecological restoration work: one is that peat bog should recover their capacity to take up surface and subsurface flows so they regain their saturated state, and the other is the need for the recovery and restoration of a natural shade cover to provide for widespread recovery of mire plants particularly that of Sphagnum spp. regeneration. The techniques used for the restoration of bog and fen ecosystems involved shading and protection of the remnant bog and fen plant populations, particularly Sphagnum species from high ultra-violet light levels and desiccation by covering the Sphagnum hummocks with shade cloth; the construction of straw-bale ‘dams’ in flowlines to create/restore surface pools; the construction of subsurface organic matter dams to slow the flow of water from the peats; and the placement of coir and straw-filled jute mesh ‘logs’ as surface water-spreaders and sediment traps.

{"zoom":7,"lat":-36.5342467,"lon":145.5231824,"markers":{"0":{"lat":-36.775742361,"lon":148.198353335}}}

Project Name: Restoring the mires of the Australian Alps following the 2003 wildfires

Organisation / Lead partner: Australian Alps national parks

Predominately: Upland

Caithness Wildfire, 2019 © Paul Turner
Burning & Peatlands Position StatementThe IUCN UK Peatland Programme have updated our position statement on Burning and Peatlands which…
Dubh lochans and blanket bog at The Flows NNR near Forsinard, Caithness. June 2011 ©Lorne Gill/SNH/2020VISION
Scottish Budget 2020-21The Scottish Government announces £20 million for peatland restoration and a commitment to invest £…
Land use: policies for a Net Zero UK CCC report
Committee on Climate Change Report on Land Use: Policies for a Net Zero UKThe IUCN UK Peatland Programme welcomes strengthened policy and legislative recommendations in the…
Multiple effects of peatland drainage
New resource available: Explaining the impact of peatland drainage.Illustrating the multiple effects of peatland drainage including implications for carbon emissions…
Managed burning of heather © North Pennines AONB
A burning issue: comparison between Australian & UK fire management misses the mark. The news of the ongoing Australian fires is deeply concerning both in terms of the impact on people…
IUCN Resolution 43 reporting
IUCN Resolution 43 reportingNew report on progress under IUCN Resolution 43: Securing the future of global peatlands available…
Langlands Moss Restoration works underway
Langlands Moss Restoration works underwayLanglands Moss Local Nature Reserve, on the south edge of East Kilbride, Scotland is set to be…
Snowdonia Society volunteers creating heather bale dams on the Migneint, Snowdonia. © Dan Struthers Photography
Working together for the future of Welsh peatlandsA major programme of works is underway this season to restore peatlands across Wales. A large…
European Peatland Strategies workshop - Bonn, Germany
European Peatland Strategies workshop - Bonn, Germany Over 30 representatives from across 12 European countries attended a workshop to examine existing…
Bog cotton landscape © Stephen Price
Peatlands and the climate emergency2019 has seen all four devolved governments across the UK declare a climate emergency which will…
Richard Payne
A tribute to Richard Payne The IUCN UK Peatlands Programme team were all saddened to hear the shocking news about the death of…
Image of sphagnum in pool © Joe Holden
Sphagnum is a key ingredient of natural flood managementIn 2008 iCASP published research that showed how water running over Sphagnum on blanket peatlands…